They’ll need a crane…they’ll need a crane…

They delivered the 120 sheets of drywall this morning. That’s a huge amount of drywall to be used in a such a small space! It’s current in the middle of the Control Room, broken up into two stacks. The electricians are actually using it as scaffolding to get up to the ceiling to run some conduit. HA!

The HVAC company sent over a couple guys this morning to cut that section of ductwork that was sticking through the wall between the Control Room and Iso-Booth. They show up and I asked if they were from Assurance and were here to cut the duct. The guy responded, “Well, it’d be easier if that friggin’ wall wasn’t there!” I’m like, “Uh, yeah. Can’t move the wall.” He said, “You guys should’ve called us immediately when you realized!” We didn’t realize it was going to be an issue until after the wall was framed. Don’t yell at me, dude. I’m the guy payin’ ya. Nice attitude.

After they started cutting, he asked if we had a fire extinguisher. I said, “Probably.” He yelled back, “You don’t have a fire extinguisher?! How can you not have a fire extinguisher!?” BTW, there are extinguishers all over the building. Then he was grumping the whole way through cutting the duct. Well, at least all the other contractors are nice…

Leave a Reply