VOCOMOTION New Studio Construction Diary

Framing!

The walls are starting to take shape now. They’ve framed out the exterior wall, with one with the door that goes out to the parking lot. The window to the outside you see in the photos is being covered over (painted black, stuffed with insulation, two layers of drywall over it all).

The guys are working on framing up the wall at the back at the Control Room now. It’s taking a bit longer because we’re using heavier gauge studs on that wall. They can’t cut those studs with tin snips, as you would normally, but instead have to use a circular saw (which makes a GREAT smell).

Leave a Reply