VOCOMOTION New Studio Construction Diary

Demolition Has Begun!

We ripped up the old carpeting in the space yesterday. There is tiny ceramic tile underneath, but we’ll be leaving that (when we tried to rip it up, it was bringing up chunks of the soft concrete below it). We’ll be putting a layer of Kinetics SR Floorboard, then two layers of 1/2″ plywood, then bamboo hardwood flooring.

The ceiling is coming down next. I’m supposed to get the full Construction Drawings from WSDG today, so I’ll post some of them here…it’s like 30-pages long, so won’t post it all.

Leave a Reply